Mining License in Saudi Arabia

Saudi Arabia holds ~SAR 5 trillion ($1.33 trillion)  in untapped mineral resources across 5,300+ sites, per MIM. Under Vision 2030, mining is set to become the third pillar of the national economy, targeting SAR 240 B ($64B) in GDP contribution by 2030.
The Mining Investment Law of 2020 (Royal Decree No. M/5) transformed the framework: faster licensing, 100% foreign ownership, and up to 30-year tenure with renewals. MIM issues all licenses through its National Mining System (NMS) portal.

RadiantBiz KSA handles it all:
✓ MISA investment approval
✓ MIM application
✓ Environmental Impact

Why Invest in Saudi Arabia's Agriculture Sector?

Agriculture is one of the strategic pillars under Saudi Arabia's National Industrial Development and Logistics Program (NIDLP), a Vision 2030 initiative aimed at building domestic food production capacity and reducing reliance on imports. The government has committed billions of riyals to this effort through subsidized loans, land allocation, and infrastructure development.
The sector is projected to grow at a compound annual growth rate of 4.9% through 2028, driven by demand from a population exceeding 36 million and a tourism industry that is expanding rapidly under Vision 2030 giga-projects.
Saudi Arabia is already the world's second-largest producer of dates and has established large-scale operations in poultry, dairy, and aquaculture. Key crops include wheat, sorghum, barley, millet, tomatoes, watermelon, cucumbers, citrus fruits, and alfalfa. The market segments span food crops and grains, fruits, vegetables, oilseeds, pulses, livestock, and aquaculture.
For foreign investors, the position is compelling: a large, growing consumer market, duty-free export access across the GCC, and a government that is actively incentivizing private participation in food production.

Benefits

Benefits of a Mining License in Saudi Arabia

01

100% foreign ownership

The Mining Investment Law generally allows full foreign ownership of mining entities, with no local partner required.

02

Exploration Enablement Program (EEP) cash incentives

License holders can access up to 25% cash incentives on eligible exploration expenditures, including drilling, lab testing, and geoscientific studies, plus up to 15% salary cost support for employees residing in the Kingdom.

03

Salary cost coverage for local talent

The EEP covers up to 70% of total local salary costs during the first two years, rising to up to 100% after the first two years, subject to program requirements.

04

SIDF co-funding up to 75%

The Saudi Industrial Development Fund provides long-term project financing covering up to 75% of capital costs for advanced exploration and development at competitive rates.

05

Direct exploration grants per license:

Under the Mining Investment Law, companies can receive exploration grants of up to SAR 7 million (approx. $1.85 million) per license for the first five licenses.

06

Five-year royalty holiday:

New extraction projects benefit from a five-year royalty holiday to reduce upfront operational costs.

07

Industrial land fee discounts:

Investors in mid-to-downstream mineral processing are eligible for a 30% discount on industrial land fees within dedicated mining areas, encouraging localisation of high-value processing.

08

Streamlined licensing timelines:

Partial mining permit processing can be compressed to 30–90 days under the new regulatory framework.

09

Access to 80+ years of geological data:

The National Geological Database provides investors with over 80 years of geological data, alongside one of the largest regional survey programs to de-risk exploration.

10

World-class infrastructure:

Integrated mine-to-market infrastructure, including specialised industrial cities like Wa’ad Al Shamal, dedicated rail freight lines, and port connectivity, supports efficient operations.

11

The entry ticket:

A valid mining license from the Ministry of Industry and Mineral Resources (MIMR) is the gateway to EEP incentives, SIDF financing, royalty holidays, and Saudi Arabia’s estimated $2.5 trillion mineral endowment.

License Types

Why Choose RadiantBiz KSA for Your Mining License

01
Single-window mode

 MISA, MOCI, MIM, and NCEC handled under one engagement. No separate vendors for investment licensing, entity formation, environmental compliance, and government relations.

02
Banking relationships

With 15+ years of corporate banking relationships across major UAE and international banks, our CEO handles corporate bank account opening for mining entities in-house — one of the most time-consuming steps for new entrants.

03
NMS pre-check

We run a pre-application area availability check on the NMS portal before any fees are committed, confirming your target area is available for the license category and mineral type you need.

04
Arabic-language GRO team

 All MIM, NCEC, and government portal correspondence is handled in Arabic by our on-the-ground team.

05
Post-license support

Annual reporting, renewal management, Saudization compliance monitoring, and NCEC environmental submissions.

Eligibility and Documents Required

Eligibility criteria

1. Capital and ownership percentages must meet the financial thresholds set by MISA for agricultural activities.
2 .If any Saudi partner is involved, their shareholding percentage must align with the financial restrictions specified for the activity type.
3 .Premium Residency holders are exempt from submitting parent company documents.
4 .If any partner holds an existing MISA license, this must be declared in the electronic application.
5. Saudi national identity, Premium Residency details, or commercial enrollment data for participating Saudi companies must be provided at the time of application.

Required documents

The application requires:

1. A certified copy of the foreign company's commercial enrollment, authenticated by the Saudi Embassy in the country of origin.
2. A national identity copy is needed for any GCC-national partners whose data is not already enrolled in the ABSHER system.
3. Audited financial statements from the most recent financial year, certified by the Saudi Embassy, must be submitted alongside proof of land ownership or a lease agreement for the agricultural land.
4. A detailed business plan covering the planned activities, scale, and investment is mandatory.
5. MEWA may also require an Environmental Impact Assessment (EIA) report depending on the project type and location.

How to Get an Agriculture License in Saudi Arabia

The process runs through four stages. The total timeline from initial application to commencing operations is typically four to seven months, depending on the activity type and how quickly documents are prepared.

Stage 1 · 4 to 6 weeks

Legal Entity Establishment

Reserve a company trade name through the Ministry of Commerce (MCI)
Draft and notarize the Articles of Association (AoA)
Obtain the Commercial Enrollment certificate
Legalize and translate all formation documents into Arabic
Obtain the MISA foreign investment license from the Ministry of Investment

Stage 2 · 4 to 8 weeks

MEWA Agriculture License Application

Submit the agriculture license application to MEWA through the electronic portal
Provide land documentation, business plan, and EIA report
MEWA reviews the application and conducts inspections where required
Receive the agriculture license upon approval
Obtain any sub-licenses specific to the activity type (pesticide, livestock, organic, etc.)

Stage 3 · 4 to 6 weeks

Government Enrollment

Enroll the company seal
Enroll with the Ministry of Human Resources and Social Development (HRSD)
Enroll with the General Organization for Social Insurance (GOSI)
Complete National Address enrollment
Enroll with the Zakat, Tax, and Customs Authority (ZATCA) for Zakat/CIT and VAT

Stage 4 · 6 to 8 weeks

Residency, Banking, and Operations

Issue the General Manager visa and Iqama
Enroll on government platforms: Muqeem, Absher, Qiwa, and Mudad
Open a corporate bank account
Apply for a water allocation permit from MEWA (where applicable)
Commence agricultural operations
enter a valid Number!
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Setup Cost

Mining License Costs and Government Incentives

The total cost of obtaining a mining license in Saudi Arabia depends on the license category, the mineral target, and whether an EIA is required. Below is an indicative breakdown of the main cost components.

Saudi Arabia Mining Business Setup Costs
Fee / Cost Item Estimated Range Payable To
MISA Investment License Fee SAR 2,000 (~$533) application fee Ministry of Investment
MOCI Commercial Enrollment SAR 1,200–1,600 (~$320–$427) Ministry of Commerce
MIM Mining License Application Varies by license category and area size Ministry of Industry and Mineral Resources
Environmental Impact Assessment SAR 50,000–500,000+ (~$13,333–$133,333+), depending on site size and complexity NCEC-approved environmental consultant
Bank Guarantee (Financial Assurance) SAR 500,000–5,000,000+ (~$133,333–$1,333,333+), scaled to environmental liability Issuing bank (held by MIM)
Legal and Advisory Fees Varies by scope of engagement Business setup consultant / law firm
Note: All figures above are indicative ranges subject to confirmation at the time of application. Environmental Impact Assessment (EIA) costs vary significantly. A small building materials quarry assessment may cost far less than an EIA for a large-scale gold mine in a biodiversity-sensitive area.

Total estimated first-year government costs: SAR 80,000–200,000+ ($21,333–53,333+) excluding land acquisition, factory construction, equipment, and working capital. Heavy industry setups with larger MODON plots and higher capital requirements will be significantly higher.
Payment deadline: MISA fees must be paid within 60 days of invoice issuance. Failure to pay within this window results in service cancellation, requiring the applicant to reapply from scratch.
All figures are approximate and based on published government fee schedules as of 2026. USD conversions use a rate of 1 SAR = $0.2666 (pegged rate). MISA license fees have been subject to periodic waivers and reviews, verify current rates at the time of application. RadiantBiz KSA provides a tailored cost estimate based on your specific industrial activity during the initial consultation.

Minimum Capital Requirements

Foreign companies applying through MISA must meet minimum capital thresholds that vary by license category. These are baseline figures — strategic mineral categories or larger concessions may carry higher requirements.

Saudi Arabia Mining License Capital Requirements
License Category Minimum Capital Additional Financial Requirement
Exploration License SAR 2,000,000 ($533,000) —
Small Mining License SAR 5,000,000 ($1,333,000) Financial guarantee covering estimated environmental remediation costs
Large-Scale Mining License SAR 20,000,000+ ($5,333,000+) Financial guarantees scaled to the environmental liability of the operation
Mineral Processing License SAR 10,000,000+ ($2,667,000+) Assessed case by case based on plant capacity and mineral type
Building Materials License Varies by region and scope Site-specific remediation bond
Important: The financial guarantee is separate from operating capital. It protects the government from inheriting remediation costs if a company exits without restoring the licensed area. RadiantBiz KSA confirms the applicable capital threshold and guarantee requirements for each client's mineral target and license category before any fees are committed.

Requirements for a Mining License in Saudi Arabia

The licensing process runs through multiple government authorities. Here is what each requires before MIM will issue your mining license.

Saudi Arabia Mining License Application Requirements
Requirement Details Applies To
MISA Investment License Must specifically authorize mining sector activities. A generic business license or a MISA license for another sector cannot be used. Foreign investors
MOCI Commercial Enrollment Active Saudi Commercial Enrollment with mining activities listed in the company's business objects. All applicants
MIM Application Submitted through the National Mining System (NMS) portal with a complete document package. All applicants
Parent Company Documents Commercial Enrollment, Articles of Association/Memorandum, and financial statements for the last fiscal year — all certified by the Saudi Embassy. Foreign investors
Shareholder Information Passport copies and personal details of all shareholders. Saudi/GCC nationals provide national identity or Premium Residency data. All applicants
Technical Competency Proof Evidence of geological expertise, mining engineering capability, or a partnership with a qualified mining operator. All applicants
Work Program and Budget Detailed plan with timelines, extraction methodology, equipment list, workforce plan, and financial commitments across the license period. All applicants
Environmental Impact Assessment EIA report approved by the National Centre for Environmental Compliance (NCEC). Mandatory for mining licenses. All applicants
Financial Guarantee Bank guarantee or equivalent financial assurance covering environmental remediation obligations for the license area. All applicants
Saudization Plan A credible phased plan to progressively employ Saudi nationals in technical and operational roles. All applicants
Note: Premium Residency holders are exempt from Embassy-certified parent company documents. If any partner was previously licensed by the Ministry of Investment, this must be disclosed in the electronic application.

Saudization Requirements for Agriculture Companies

All private-sector companies in Saudi Arabia must comply with the Nitaqat system, which sets minimum Saudi employee ratios.
Companies are classified into color-coded bands (Platinum, Green, Yellow, Red) based on their compliance level. Falling into the Red band restricts visa issuance, Iqama renewals, and other government services.
The required Saudization percentage for agriculture companies varies by company size and specific sub-activity. The Ministry of Human Resources and Social Development (HRSD) sets and periodically updates these ratios. Some exemptions and reduced ratios apply to new entrants and small companies during their first year of operations.
RadiantBiz KSA assists with Saudization compliance planning, Qiwa platform management, and connecting employers with Saudi talent pools to meet the required thresholds without disrupting operations

Tax Requirements: Zakat, Corporate Tax, and VAT for Agriculture

Saudi and GCC-owned entities pay Zakat at 2.5% on their adjusted net worth. Foreign-owned entities pay Corporate Income Tax (CIT) at 20% on net adjusted profits instead. Mixed-ownership entities split the obligation proportionally.
VAT applies at the standard rate of 15%. However, certain agricultural inputs and unprocessed produce may qualify for zero-rating or exemption. The specifics depend on the product category and the stage of the supply chain. Processed food products are generally subject to the full rate.
Withholding tax applies to certain cross-border payments such as royalties, management fees, and technical service fees repatriated to a parent company outside Saudi Arabia. Rates vary by payment type and whether a double taxation treaty exists with the investor's home country.
Enrollment with ZATCA is mandatory for all businesses. For a detailed breakdown of your tax obligations, speak to our tax team at RadiantBiz KSA.

Our Process

Our Process

How Our Referral Program Works

How Our Referral Program Works

01

2–4 weeks

Geological and market feasibility: identify target minerals, review the SGS geological database, and confirm area availability through the NMS portal.
Enter your name, email, and phone number
Verify with OTP
Your account is ready

02

4–8 weeks

MISA investment license application specifying mining sector activities and demonstrating minimum capital compliance (foreign investors only).
✓ International Expansion  ✓ Strategic Structuring  ✓ Long-Term Control

03

2–4 weeks

MOCI Commercial Enrollment with mining activities in the CR objects. Legal entity establishment in Saudi Arabia.
✓ International Expansion  ✓ Strategic Structuring  ✓ Long-Term Control

04

4–12 weeks

Environmental Impact Assessment preparation and NCEC submission. This must be approved before MIM will process your mining license application.
✓ International Expansion  ✓ Strategic Structuring  ✓ Long-Term Control

05

2–4 weeks

Technical work program preparation: geological plan, extraction methodology, equipment list, workforce plan, and budget.
✓ International Expansion  ✓ Strategic Structuring  ✓ Long-Term Control

06

Same day

MIM application submission through the NMS portal with the complete document package.
✓ International Expansion  ✓ Strategic Structuring  ✓ Long-Term Control

07

4–12 weeks

MIM review and technical evaluation. The ministry may conduct a site visit or request additional geological data.
✓ International Expansion  ✓ Strategic Structuring  ✓ Long-Term Control

08

2–4 weeks

License agreement signing and financial guarantee submission. License issuance and area demarcation on NMS
✓ International Expansion  ✓ Strategic Structuring  ✓ Long-Term Control

Water Allocation and Irrigation Permits

Water is the most critical operational factor for agriculture in Saudi Arabia, and it is tightly regulated. MEWA manages all water allocation for agricultural use, and a separate water permit is required alongside the Saudi Arabia agriculture license.
Well drilling requires a specific permit from MEWA. Unauthorized drilling carries significant penalties, including license suspension. The government has also imposed restrictions on water-intensive crops, particularly alfalfa and wheat in certain regions, to preserve aquifer levels.
Programs to expand non-conventional water sources for agriculture are underway, including treated wastewater reuse and desalinated water allocation for farming use. Subsidies are available through the Agricultural Development Fund for modern irrigation systems, including drip irrigation, sprinkler systems, and precision water management technology

AgriTech and Smart Farming Incentives

Saudi Arabia is investing heavily in agricultural technology. Vertical farming, precision agriculture, and solar-powered irrigation projects are all receiving government backing.
NEOM's food and water innovation zone is open to foreign partnerships, and research institutions including KAUST have active programs for agricultural technology transfer.
The National Technology Development Program (NTDP) offers incentive programs for agri-tech startups, and controlled-environment agriculture (CEA), including greenhouses and indoor farming, is gaining particular support in urban centers like Riyadh and Jeddah where land is scarce but consumer demand is high.

Mineral Resources in Saudi Arabia — What Can Be Mined

The Kingdom's geology spans the Arabian Shield in the west (rich in gold, copper, and base metals), the Northern Borders region (phosphate), and Al Qassim (bauxite), with building materials distributed across all 13 administrative regions. The Saudi Geological Survey (SGS) has mapped these deposits in detail.
Saudi Arabia Mineral Categories and Mining Locations
Mineral Category Key Minerals Primary Locations License Type Needed
Gold & Precious Metals Gold, silver Arabian Shield: Mahd Ad Dahab, Ad Duwayhi, Bulghah, Mansourah Massarah Mining License / Exploration License
Phosphate Phosphate rock Northern Borders: Ma'aden Wa'ad Al Shamal (11.6M tonnes/year capacity) Mining License
Bauxite & Aluminium Bauxite Al Qassim: Ma'aden aluminium smelter and associated integrated operations Mining License
Copper & Base Metals Copper, zinc, lead Arabian Shield: Jabal Sayid copper mine and multiple polymetallic deposits Mining License / Exploration License
Rare Earth Elements REEs, critical minerals Multiple locations under assessment, with strategic importance for global supply chains Exploration License
Building Materials Sand, gravel, limestone, gypsum All 13 regions Building Materials License
Did you know? Saudi Arabia's Arabian Shield has a long history of gold mining. Mahd Ad Dahab translates to "Cradle of Gold" and is one of the Kingdom's historic gold mining sites.

The appropriate license depends on the mineral, project stage, location, and applicable mining regulations. Exploration and extraction may require different approvals.

Agriculture License Renewal

Saudi Arabia agriculture licenses must be renewed periodically as specified by MEWA, typically on an annual basis. Renewal requires updated financial statements and evidence of ongoing compliance with MEWA regulations. Late renewals can result in penalties, suspension of operations, or freezes on visa and Iqama processing for your employees.
RadiantBiz KSA offers annual renewal management as part of its GRO services, ensuring deadlines are tracked and submissions are handled before they become problems
Faq

Frequently Asked Questions

Can a 100% foreign-owned company get an industrial license in Saudi Arabia?
What is the minimum capital required for an industrial license?
How long does it take to get an industrial license in Saudi Arabia?
 What is the difference between an industrial license and a commercial license?
What is the difference between a commercial license and a professional license?
Do I need a MISA investment license before the industrial license?
What are the Saudization requirements for factories?
Can I convert an existing commercial license to an industrial license?
What is MODON, and do I have to use a MODON industrial city?
Are there tax incentives for manufacturers in Saudi Arabia?
What ongoing compliance is required after obtaining an industrial license?